Campaign
Building the Future for Students in Liberia
The first classrooms are open, and the high school building is continuing to move forward. Help us pour the second-story slab and complete the building.
Give to This CampaignHelp Complete the High School Building
Overall Campaign
60% Funded
$224,000 funded to date
$374,000 total project need
Funded to Date
$224,000
Total Remaining
$150,000
Immediate Need
$31,000
Needed to pour the second-story concrete slab before the fall mission trip.
This is the next urgent milestone within the larger $150,000 remaining need to complete the high school building.
Why This Building Matters
As enrollment has grown, our classrooms have become overcrowded. Students sit three to a bench. Younger and older students share spaces that weren't designed for combined use. Teachers do their best, but the physical limitations are real.
The new high school building will provide dedicated classrooms, proper ventilation, and space for students to learn without the crowding that slows them down. The first floor is already complete and in use - and now we are pressing on toward the second story. The next immediate need is $31,000 to pour the second-story concrete slab before the fall mission trip, within the larger $150,000 remaining need to complete the building.
This expansion is part of the vision Tony and Elizabeth Weedor carried together - that every student who walks through the doors of Petals of Hope would have a real place to grow, not just a seat squeezed into an overflow room.


Construction Milestones
Foundation and first-floor structure
CompleteFirst-floor classrooms completed
CompleteStudents using new classrooms
CompletePour the second-story concrete slab
In ProgressAdditional classrooms and facilities
Full high school campus operational
Construction Progress

Where We Are Now
The first floor of the new high school building is complete and already filled with students. Classrooms are in use, and the difference is immediate - more space, better light, and room to breathe.
Work is now moving to the second story. The next immediate need is $31,000 to pour the second-story concrete slab before the fall mission trip - the next urgent milestone within the larger $150,000 remaining need to complete the high school building. Every gift helps us keep materials flowing and workers paid.
With your help, we'll finish what was started - and give every student a safe, permanent place to learn.
Help Complete the High School
Every gift - large or small - brings us closer to pouring the second-story slab and completing this building for the students of Liberia.